To enhance system reliability and prepare for future operational demands, SISO Engineering conducted comprehensive testing across all LMS100 Mark VIe systems. Through detailed software validation and targeted component upgrades, the team corrected controller heartbeat failures, reflash anomalies, and latent configuration mismatches. The work significantly reduced the site’s exposure to forced outages and created a validated baseline for future upgrades, protecting a clean power producer and developer’s investment in their critical assets.